Family Income and Expenditure Survey 2006 Volume 2
Philippines, 2006 - 2007
Reference ID
PHL-NSO-FIES-2006-v02
Producer(s)
Philippine Statistics Authority
Collection(s)
Metadata
Related Microdata
Created on
Sep 14, 2021
Last modified
Sep 15, 2021
Page views
255645
Downloads
1497
- Data files
- FIES06V2
Construction expenses (eaconexp)
Data File: FIES06V2
Overview
vald
38483
vald
17403481.98
invd
0
invd
0
min
0
max
13355000
mean
2191.246
mean
2066.46
stdev
124302.43
stdev
118097.885
Interval
contin
Decimal
0
range
0 - 13355000
Description
Text
A contractor usually provides labor but sometimes he contracts the entire structure without the owner providing any material. In inquiring about expenses, try to provide the details as called for in this subsection. Try to assess the construction enterprise if the net income is realistic. Usually contractors are allowed a margin of profit of about 15 percent, which is added to the cost estimates of materials and labor.
The constructed price cost of labor is 30-40 percent of the total cost of materials.
The constructed price cost of labor is 30-40 percent of the total cost of materials.